  "reviewedAt": "2026-11-09",
  "scope": "Follow-up review of the 24 cases that previously lacked a numerical scenario. Sorted by the existing headline amount; those amounts measure different things.",
  "reviews": [
    {
      "caseId": "medicaid-payment-errors-2025",
      "status": "Amount narrowed; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "CMS separates monetary-loss errors from documentation problems. Rounded table S2A components for ineligible beneficiaries, other monetary losses and unenrolled providers total $8.27 billion. The $37.39 billion headline covers more error categories. The April 2025 PERM manual confirms that sampling uses original paid or denial dates. RY2025 covers July 1, 2023–June 30, 2024; the rolling national estimate also uses earlier cycles.",
      "missing": "Obtain dollar-weighted payment dates by error category and state cycle. The rolling national estimate cannot be distributed over calendar years from review-year labels alone.",
      "sources": [
        {
          "title": "CMS 2025 Medicaid and CHIP supplemental data, table S2A",
          "url": "https://www.cms.gov/files/document/2025-medicaid-chip-supplemental-improper-payment-data.pdf"
        },
        {
          "title": "CMS PERM manual, sampling payment dates and cycles",
          "url": "https://www.cms.gov/files/document/perm-manual.pdf-2"
        }
      ],
      "verifiedAmountUsd": 8270000000,
      "amountBasis": "Rounded monetary-loss error categories; actual dates unresolved"
    },
    {
      "caseId": "medicare-ffs-payment-errors-2025",
      "status": "Amount narrowed; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "CMS table A4 projects $27.9 billion in overpayments and $1.0 billion in underpayments, rounded. The sampled claims were submitted July 2023–June 2024. That is a claim-submission window. The 2025 public CERT data dictionary contains eight fields, including claim ID and error code, but no payment amount or payment date.",
      "missing": "Collect payment dates and later corrections or recoveries for the sampled claims. Documentation errors remain distinct from established fraud.",
      "sources": [
        {
          "title": "CMS 2025 Medicare FFS supplemental data, table A4",
          "url": "https://www.cms.gov/files/document/nov-2025-medicare-ffs-supplemental-improper-payment-data-2025922.pdf"
        },
        {
          "title": "CMS 2025 CERT public-data dictionary",
          "url": "https://data.cms.gov/data-api/v1/dataset/dc7c7abe-57bf-41e5-a858-1d04d431d542/dictionary"
        }
      ],
      "verifiedAmountUsd": 27900000000,
      "amountBasis": "Rounded projected overpayments; claim-submission dates only"
    },
    {
      "caseId": "california-homelessness",
      "status": "Cumulative spending added",
      "reviewedAt": "2026-11-09",
      "finding": "HCD reports $2.699 billion of fully paid HHAP expenses across six grant rounds through July 31, 2026. This HHAP series extends beyond the funding years covered by the $24 billion headline.",
      "missing": "Collect grantee-level payment dates, invoices, outcomes and corrections. The cumulative totals cannot locate spending within each reporting window.",
      "sources": [
        {
          "title": "HCD HHAP fiscal dashboard, all rounds, activity through July 31, 2026",
          "url": "https://www.hcd.ca.gov/housing-open-data-tools/hhap-dashboard"
        },
        {
          "title": "State funding guide, HHAP implementation and disbursement chronology",
          "url": "https://www.bcsh.ca.gov/calich/documents/putting_the_funding_pieces_together.pdf"
        },
        {
          "title": "HCD fiscal reporting definitions",
          "url": "https://www.hcd.ca.gov/funding/hhap/reporting"
        },
        {
          "title": "California homelessness program audit",
          "url": "https://www.auditor.ca.gov/reports/2023-102-1/"
        }
      ],
      "verifiedAmountUsd": 2698770244.73,
      "amountBasis": "Self-reported cumulative HHAP expenditures"
    },
    {
      "caseId": "future-combat-systems",
      "status": "Cash schedule missing",
      "reviewedAt": "2026-11-09",
      "finding": "The reviewed GAO funding profiles and contract-fee structures do not provide a reconciled historical cash-payment ledger. The $21 billion program figure also covers work that was transferred or reused. Later budget analyses identify program-element actual funding, but the underlying R-1 schedule is total obligational authority. Those rows do not establish cash-payment dates.",
      "missing": "Obtain Army payment and contract-closeout records by date, identify transferred deliverables and reconcile credits before applying a cutoff.",
      "sources": [
        {
          "title": "GAO FCS funding profile and estimates",
          "url": "https://www.gao.gov/assets/a273426.html"
        },
        {
          "title": "GAO FCS contract and fee review",
          "url": "https://www.gao.gov/assets/a261687.html"
        }
      ]
    },
    {
      "caseId": "va-ehr-modernization",
      "status": "Annual cash outlays added",
      "reviewedAt": "2026-11-09",
      "finding": "Seven actual-year columns in federal budget appendices report $9.445 billion in gross outlays for account 036-1123 during FY2019–FY2025. Future estimates and obligations are excluded.",
      "missing": "Collect FY2018 and later years, contract-level payment dates, account offsets and the value of usable systems. The account includes infrastructure and program support.",
      "sources": [
        {
          "title": "VA announces signed Cerner contract",
          "url": "https://news.va.gov/press-room/statement-by-acting-secretary-robert-wilkie-va-signs-contract-with-cerner-for-an-electronic-health-record-system/"
        },
        {
          "title": "GAO review of cost and schedule gaps",
          "url": "https://www.gao.gov/products/gao-25-106874"
        },
        {
          "title": "Budget Appendix, FY2019 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2021-APP/html/BUDGET-2021-APP-1-20.htm"
        },
        {
          "title": "Budget Appendix, FY2020 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2022-APP/pdf/BUDGET-2022-APP-1-19.pdf"
        },
        {
          "title": "Budget Appendix, FY2021 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2023-APP/pdf/BUDGET-2023-APP-1-19.pdf"
        },
        {
          "title": "Budget Appendix, FY2022 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2024-APP/pdf/BUDGET-2024-APP-1-19.pdf"
        },
        {
          "title": "Budget Appendix, FY2023 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2025-APP/pdf/BUDGET-2025-APP-1-19.pdf"
        },
        {
          "title": "Budget Appendix, FY2024 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2026-APP/pdf/BUDGET-2026-APP-2-19.pdf"
        },
        {
          "title": "Budget Appendix, FY2025 actual gross outlays, account 036-1123",
          "url": "https://www.govinfo.gov/content/pkg/BUDGET-2027-APP/pdf/BUDGET-2027-APP-2-18.pdf"
        }
      ],
      "verifiedAmountUsd": 9445000000,
      "amountBasis": "Actual annual gross outlays, rounded to millions"
    },
    {
      "caseId": "honolulu-skyline",
      "status": "One year of cash payments added",
      "reviewedAt": "2026-11-09",
      "finding": "Honolulu’s audited FY2024 statement reports $306.748 million in HART cash payments for acquisition and construction of capital assets. The historical $9.188 billion forecast is a different measure.",
      "missing": "Collect HART’s other fiscal years and contractor payment dates. Earlier city financial statements classify HART differently, so unrelated city transportation columns cannot fill the gap.",
      "sources": [
        {
          "title": "Honolulu FY2024 audited cash-flow statement, page 63 (PDF page 76)",
          "url": "https://www.honolulu.gov/oca/wp-content/uploads/sites/39/2025/01/ACFR-2024.pdf"
        },
        {
          "title": "HART begins operations",
          "url": "https://honolulutransit.org/hart-board-of-directors-meeting-7-1-2011/"
        },
        {
          "title": "Hawaii Auditor Report 19-03",
          "url": "https://files.hawaii.gov/auditor/Overviews/2019/19-03AuditorSummary.pdf"
        }
      ],
      "verifiedAmountUsd": 306748000,
      "amountBasis": "FY2024 HART capital cash payments"
    },
    {
      "caseId": "mox-facility",
      "status": "Cumulative amounts; schedule missing",
      "reviewedAt": "2026-11-09",
      "finding": "DOE’s 2014 audit reports about $4 billion of cumulative expenditures. A later $7 billion spending figure covers a longer period. These rounded totals do not identify the intervening payment dates.",
      "missing": "Obtain monthly NNSA contractor payments, termination costs and retained-asset values. The separate $13 billion future cost avoidance after cancellation cannot be counted as money already paid.",
      "sources": [
        {
          "title": "DOE 2014 MOX audit",
          "url": "https://www.energy.gov/ig/articles/audit-report-doeig-0911"
        },
        {
          "title": "DOE 2019 MOX subcontract-cost audit",
          "url": "https://www.energy.gov/ig/articles/audit-report-doe-oig-20-16"
        }
      ]
    },
    {
      "caseId": "gps-ocx",
      "status": "Dated expenditure snapshot added",
      "reviewedAt": "2026-11-09",
      "finding": "Reported OCX expenditures of $4.4216 billion through February 10, 2020. Separate from the later $6.27 billion program-cost headline. The expenditure table distinguishes $4.4216 billion expended from $4.9502 billion appropriated and $6.2538 billion total acquisition cost. Only the expended amount enters this review.",
      "missing": "Obtain the individual payments or dated period totals within the $4.4216 billion snapshot and reconcile later payments, program scope and delivered work.",
      "sources": [
        {
          "title": "DoD December 2019 SAR, expenditure table, page 43",
          "url": "https://www.esd.whs.mil/Portals/54/Documents/FOID/Reading%20Room/Selected_Acquisition_Reports/FY_2019_SARS/20-F-0568_DOC_66_OCX_SAR_Dec_2019_Full.pdf"
        },
        {
          "title": "DoD December 2012 SAR, first funding year and program scope",
          "url": "https://www.esd.whs.mil/Portals/54/Documents/FOID/Reading%20Room/Selected_Acquisition_Reports/FY_2012_SARS/GPS_OCX_December_2012_SAR.pdf"
        },
        {
          "title": "GAO 2017 weapon-program assessment, GPS OCX",
          "url": "https://www.gao.gov/products/gao-17-333sp"
        }
      ],
      "verifiedAmountUsd": 4421600000.0,
      "amountBasis": "Selected reported payments with source-specific uncertainty"
    },
    {
      "caseId": "sbinet",
      "status": "Cumulative expenditures added",
      "reviewedAt": "2026-11-09",
      "finding": "GAO table 6 reports $745.9 million expended on SBInet through March 31, 2010, separately from $958.0 million obligated and $1,469.2 million appropriated.",
      "missing": "Obtain payments within the cumulative window and after March 2010, then value accepted border equipment and services.",
      "sources": [
        {
          "title": "GAO-10-877R, table 6, funds expended through March 31, 2010",
          "url": "https://www.gao.gov/assets/a96976.html"
        },
        {
          "title": "GAO-10-340, September 2006 Boeing contract",
          "url": "https://www.gao.gov/assets/a304041.html"
        }
      ],
      "verifiedAmountUsd": 745900000,
      "amountBasis": "CBP-reported cumulative expenditures"
    },
    {
      "caseId": "nyc-citytime",
      "status": "Payment dates added",
      "reviewedAt": "2026-11-09",
      "finding": "Checkbook NYC rows for SAIC contract CT113120040003544, issued February 16–October 27, 2010. Matched using the vendor, payroll agency, contract and TIME capital-project codes. 115 source rows total $98,997,876.22. Counting one copy of each identical visible row gives $81,715,573.22. Fifteen repeated rows account for $17,282,303.00. Without the missing accounting-line identifiers, that difference stays in the upper bound.",
      "missing": "Reconcile the 15 repeated visible rows using accounting-line identifiers. Obtain earlier CityTime payments and match recoveries and delivered work to this contract.",
      "sources": [
        {
          "title": "Checkbook NYC contract and dated payment search",
          "url": "https://www.checkbooknyc.com/smart_search/citywide?search_term=CT113120040003544"
        },
        {
          "title": "Archived Checkbook export, all 115 original rows",
          "url": "https://www.impactline.org/data/citytime-checkbook-export.csv"
        },
        {
          "title": "Comptroller CityTime oversight audit",
          "url": "https://comptroller.nyc.gov/reports/audit-report-on-the-office-of-payroll-administrations-monitoring-of-the-oversight-of-the-citytime-project-by-spherion-atlantic-enterprises-llc/"
        }
      ],
      "verifiedAmountUsd": 81715573.22,
      "amountBasis": "Selected reported payments with source-specific uncertainty"
    },
    {
      "caseId": "katrina-rita-individual-assistance",
      "status": "Estimated losses; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "GAO estimates improper and potentially fraudulent assistance paid through February 2006. Examples of individual checks cannot supply dates for the whole estimated loss range.",
      "missing": "Obtain FEMA transaction dates, error categories and recoveries for the audited population. Preserve the uncertainty of the sample-based estimate.",
      "sources": [
        {
          "title": "GAO-06-844T: Hurricanes Katrina and Rita Disaster Relief",
          "url": "https://www.gao.gov/assets/gao-06-844t.pdf"
        }
      ]
    },
    {
      "caseId": "usaid-contract-bribery",
      "status": "Contract headline narrowed",
      "reviewedAt": "2026-11-09",
      "finding": "A plea statement lists about $552.5 million in contract values and $156,034,338 allocated. Three listed contracts worth $286.8 million were not awarded. Allocated funds still do not establish cash paid.",
      "missing": "Obtain agency disbursements, paid invoices and accepted deliverables for awarded contracts. Separate attempted awards, bribes, company revenue and government overcharges.",
      "sources": [
        {
          "title": "DOJ plea statement, contract and allocation table",
          "url": "https://www.justice.gov/criminal/media/1413956/dl?inline="
        }
      ],
      "verifiedAmountUsd": 156034338,
      "amountBasis": "Allocated funds in plea table; cash payments unverified"
    },
    {
      "caseId": "kemper-clean-coal",
      "status": "Cumulative reimbursements added",
      "reviewedAt": "2026-11-09",
      "finding": "DOE OIG reports approximately $382 million reimbursed through January 2017 under a cooperative agreement initially awarded in February 2006.",
      "missing": "Collect the reimbursement dates and allowable-cost review. The planned $270 million federal share is not an earlier cash-payment observation.",
      "sources": [
        {
          "title": "DOE OIG-IR-17-03, federal reimbursements through January 2017",
          "url": "https://www.energy.gov/ig/articles/information-report-oig-ir-17-03"
        }
      ],
      "verifiedAmountUsd": 382000000,
      "amountBasis": "Approximate cumulative DOE reimbursements"
    },
    {
      "caseId": "booz-allen-cost-allocation",
      "status": "Settlement; payment dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "DOJ describes alleged improper cost allocations during roughly 2011–2021 and a $377.45 million settlement. The settlement does not supply dates and amounts of the underlying excess charges.",
      "missing": "Collect contract-level paid cost claims, allocation adjustments and recoveries. Keep settlement remedies separate from the original payment population.",
      "sources": [
        {
          "title": "DOJ: Booz Allen Agrees to Pay $377.45 Million to Settle False Claims Act Allegations",
          "url": "https://www.justice.gov/archives/opa/pr/booz-allen-agrees-pay-37745-million-settle-false-claims-act-allegations"
        }
      ]
    },
    {
      "caseId": "california-operation-skip-trace",
      "status": "Billed claims; paid amount missing",
      "reviewedAt": "2026-11-09",
      "finding": "The reported $267 million concerns alleged fraudulent billing across hospice companies. Billed claims can differ from claims actually paid.",
      "missing": "Obtain Medi-Cal remittance dates, denials, reversals, recoveries and subsequent court findings before assigning a savings amount.",
      "sources": [
        {
          "title": "California DOJ: Operation Skip Trace hospice fraud charges",
          "url": "https://oag.ca.gov/news/press-releases/attorney-general-bonta-dismantles-los-angeles-hospice-fraud-ring-responsible-267"
        }
      ]
    },
    {
      "caseId": "futuregen-2",
      "status": "Funding total; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "GAO reports $200,523,859 in DOE funding across the two FutureGen 2.0 awards. The reviewed table does not provide the disbursement dates or final closeout adjustments. DOE reported $92 million in FutureGen-program outlays in a 2013 Senate budget response. The response does not reconcile that program total to the two FutureGen 2.0 awards.",
      "missing": "Obtain award drawdowns and closeout statements for both recipients. Account for accepted design work and returned funds.",
      "sources": [
        {
          "title": "GAO carbon-capture awards, table 1",
          "url": "https://www.gao.gov/assets/gao-22-105111.pdf"
        },
        {
          "title": "DOE FY2014 budget hearing, written response, page 71",
          "url": "https://www.govinfo.gov/content/pkg/CHRG-113shrg81214/pdf/CHRG-113shrg81214.pdf"
        }
      ],
      "verifiedAmountUsd": 200523859,
      "amountBasis": "DOE funding reported by GAO; payment dates unresolved"
    },
    {
      "caseId": "hydrogen-energy-california",
      "status": "Funding total; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "GAO reports $153,428,898 in DOE funding. The earlier audit’s $75 million spent by March 2011 combines federal and private money, so it cannot define an earlier federal-payment total.",
      "missing": "Obtain federal drawdowns by date, cost-share reconciliations, retained work and closeout recoveries.",
      "sources": [
        {
          "title": "GAO carbon-capture awards, table 1",
          "url": "https://www.gao.gov/assets/gao-22-105111.pdf"
        },
        {
          "title": "DOE 2013 HECA audit",
          "url": "https://www.energy.gov/ig/articles/audit-report-oas-ra-13-22"
        }
      ],
      "verifiedAmountUsd": 153428898,
      "amountBasis": "DOE funding; exact dates unresolved"
    },
    {
      "caseId": "summit-texas-clean-energy",
      "status": "Dated expenditure snapshot added",
      "reviewedAt": "2026-11-09",
      "finding": "Approximately $116 million in DOE reimbursements through February 2016. This earlier cash snapshot is separate from the later $117.88 million funding figure. Uses the report’s actual reimbursement total. The initial $15 million phase limit, $450 million commitment and $90 million funding shift do not establish dates of cash payments.",
      "missing": "Obtain the reimbursement schedule, closeout payment ledger and actual repayments. A cumulative snapshot does not locate payments around the early checkpoint.",
      "sources": [
        {
          "title": "DOE OIG special report, reimbursements through February 2016",
          "url": "https://www.energy.gov/sites/prod/files/2016/04/f30/OIG-SR-16-02.pdf"
        }
      ],
      "verifiedAmountUsd": 116000000.0,
      "amountBasis": "Selected reported payments with source-specific uncertainty"
    },
    {
      "caseId": "fbi-virtual-case-file",
      "status": "Loss figure unverified; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "DOJ OIG records the FBI’s $104.5 million loss estimate, $53.3 million reusable portion and $12.2 million unspent. OIG explicitly says it did not verify those figures.",
      "missing": "Reconcile VCF-specific contract payments and accepted work. The wider Trilogy program includes infrastructure that cannot all be assigned to VCF.",
      "sources": [
        {
          "title": "DOJ OIG Trilogy and Virtual Case File review",
          "url": "https://oig.justice.gov/archives/reports/FBI/a0703/intro.htm"
        }
      ]
    },
    {
      "caseId": "health-net-va-billing",
      "status": "Audited payment subset added",
      "reviewedAt": "2026-11-09",
      "finding": "VA OIG table 7 identifies $32,076,400 in Health Net duplicate payments within the reviewed bulk-payment window. The audit also records an April 2018 recovery for Choice overpayments. The notes do not establish which duplicate claims were included in that recovery or the later settlement.",
      "missing": "Collect duplicate-payment dates and match each recovery to the same claims. The full $97.24 million later repayment includes a broader population and interest.",
      "sources": [
        {
          "title": "VA OIG bulk-payment audit, table 7 and recovery note",
          "url": "https://www.vaoig.gov/sites/default/files/reports/2018-09/VAOIG-17-02713-231.pdf"
        }
      ],
      "verifiedAmountUsd": 32076400,
      "amountBasis": "Audited duplicate-payment subset before recovery reconciliation"
    },
    {
      "caseId": "mississippi-tanf",
      "status": "Payment dates added",
      "reviewedAt": "2026-11-09",
      "finding": "Selected MCEC and FRC payments documented in the state-published 2021 forensic findings. This is a $1,206,301.94 subset of the broader welfare case. Fourteen records have an exact reported payment or check date. One $13,500 total spans two reported check dates. The three Brookhaven checks cleared on February 11, 2019. They are dated here by issue date.",
      "missing": "Collect the remaining payment and bank-clearing records, resolve source inconsistencies and match recovered amounts to these particular disbursements.",
      "sources": [
        {
          "title": "MDHS forensic findings, payment tables and check dates",
          "url": "https://www.mdhs.ms.gov/document/tanf-forensic-findings/"
        }
      ],
      "verifiedAmountUsd": 1206301.94,
      "amountBasis": "Selected reported payments with source-specific uncertainty"
    },
    {
      "caseId": "louis-berger-overhead",
      "status": "Remedies separated; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "The $69.3 million headline combines an $18.7 million criminal penalty and $50.6 million civil settlement. DOJ also describes earlier credits. These remedies do not form the original overcharge ledger.",
      "missing": "Obtain dated excess-overhead charges, government payments and credits. Reconcile the civil review period with the criminal conduct period.",
      "sources": [
        {
          "title": "DOJ Louis Berger settlement and earlier credits",
          "url": "https://www.justice.gov/archive/usao/md/news/archive/SchemetoDefraudGovernmentLeadstoCriminalChargesandCivilPenaltiesforLouisBergerGroupInc.html"
        }
      ]
    },
    {
      "caseId": "fat-leonard-navy",
      "status": "Court remedies; dates missing",
      "reviewedAt": "2026-11-09",
      "finding": "The sentencing announcement gives forfeiture and restitution amounts. Those overlapping legal remedies do not identify each inflated Navy payment.",
      "missing": "Obtain paid port-service invoices, substantiated overcharges, payment dates and recoveries. Count the underlying loss once.",
      "sources": [
        {
          "title": "DOJ: Leonard Glenn Francis Sentenced to 15 Years",
          "url": "https://www.justice.gov/usao-sdca/pr/leonard-glenn-francis-sentenced-15-years-prison-massive-bribery-fraud-and"
        },
        {
          "title": "U.S. District Court: Leonard Glenn Francis criminal judgment",
          "url": "https://www.govinfo.gov/content/pkg/USCOURTS-casd-3_13-cr-03781/pdf/USCOURTS-casd-3_13-cr-03781-7.pdf"
        }
      ]
    },
    {
      "caseId": "nycha-repair-bribery",
      "status": "Contracts and bribes separated",
      "reviewedAt": "2026-11-09",
      "finding": "DOJ reports convictions linked to repair-contract bribery. Contract values and bribes measure different things, and the reviewed source does not quantify the government’s overpayments.",
      "missing": "Obtain paid repair orders, inspections and proven overcharges or undelivered work. Bribe amounts alone cannot establish avoidable government payments.",
      "sources": [
        {
          "title": "DOJ: All 70 NYCHA Employees Charged in 2024 Sweep Convicted",
          "url": "https://www.justice.gov/usao-sdny/pr/all-70-nycha-employees-charged-february-2024-sweep-convicted-bribery-fraud-or"
        }
      ]
    }
  ]
}